Skip to main content

Mamsha Palm

Starting from
AED 3,600,000
Layouts
1 to 4 bedrooms
Expected handover
Dec 2028

About the Project

Mamsha Palm is a limited collection of 44 palm-inspired apartments and duplex residences by Aldar Properties in Saadiyat Cultural District, with sea views and Japanese-inspired wellness amenities.

Read more

Aldar Properties presents Mamsha Palm in Saadiyat Cultural District, Abu Dhabi, with residences starting from AED 3,600,000 and handover currently listed for Q4 2028.

Project overview

Mamsha Palm is a single-building collection of 44 exclusive residences designed by Koichi Takada. The biophilic architecture draws on the protective canopy of a palm, with flowing terraces, abundant planting and broad views towards Saadiyat's cultural landmarks and the sea. The reviewed range covers one-bedroom homes, two-bedroom homes including study layouts, three-bedroom homes with a maid's room, and a four-bedroom duplex.

Amenities

  • Traditional Japanese tea room
  • Japanese-inspired bathhouse and sauna
  • Light-filled gym and movement studio
  • Elevated infinity pool overlooking Saadiyat
  • Dedicated children's play room
  • Double-height lobby lounge and concierge service
  • Ground-floor retail within the building

About the developer

Aldar Properties is an Abu Dhabi-based real estate and lifestyle developer with residential, commercial, retail and hospitality destinations across the UAE. Mamsha Palm combines Aldar's Saadiyat setting with Koichi Takada's nature-led architectural approach.

Floor plans & availability

The reviewed plan pack contains nine individual layouts, and every unit type in this payload has its own floor-plan file. The selection comprises three one-bedroom types, three two-bedroom types, two three-bedroom-plus-maid types and one four-bedroom-plus-maid duplex spanning lower and upper levels. The development is marked available and every unit's on-request flag is set to No.

Who it's for

Mamsha Palm is suited to residents and buyers seeking a low-rise Saadiyat home with strong design character, cultural-district access and a focused wellness programme. One- and two-bedroom layouts support individuals, couples and smaller households, while the three-bedroom and duplex plans add studies, maid's rooms and larger indoor-outdoor living areas for families.

Location

Saadiyat Cultural District

Mamsha Palm is located in the Saadiyat Cultural District on Saadiyat Island, Abu Dhabi, surrounded by some of the capital’s most prominent cultural and lifestyle destinations. Louvre Abu Dhabi is approximately 5 minutes away, Zayed National Museum around 8 minutes, Yas Island about 15 minutes, and both Corniche Road and Zayed International Airport can be reached in approximately 20 minutes by car.

Payment Plan

  1. 10%

    Down payment

    On booking

  2. 55%

    During construction

    During construction

  3. 35%

    On handover

    On handover

Units and Floor Plans

Apartments8 plans
Duplexes1 plan

Master Plan

Mamsha Palm ground-floor site plan showing the building footprint, arrival and surrounding street edge
Open master plan

Frequently Asked Questions

Where is Mamsha Palm located?

Mamsha Palm is in Saadiyat Cultural District on Saadiyat Island, Abu Dhabi, close to Louvre Abu Dhabi and the district's museums and waterfront.

Who is developing Mamsha Palm?

Mamsha Palm is developed by Aldar Properties and designed by Koichi Takada.

What homes are available at Mamsha Palm?

The reviewed collection includes one-, two- and three-bedroom apartments plus a four-bedroom duplex. Several larger layouts include a study, maid's room or both.

What is the starting price at Mamsha Palm?

Current listing prices start from AED 3,600,000. Prices and specific unit availability should be reconfirmed before reservation.

When is Mamsha Palm expected to be completed?

The current listing gives a planned handover in Q4 2028.

What is the payment plan for Mamsha Palm?

The current listing presents a 65/35 payment structure, with 65% during construction and 35% on handover.

What amenities does Mamsha Palm offer?

Amenities include a Japanese tea room, bathhouse and sauna, gym, elevated infinity pool, children's play room, lobby lounge, concierge and ground-floor retail.

Are individual floor plans included for every Mamsha Palm unit type?

Yes. All nine listed unit types have an individual floor-plan file, and each is marked not available on request.

Disclaimer: Projectory.ae operates solely as a digital property marketing and listing platform and is not a licensed real estate broker, agent, developer, or property owner, and does not provide brokerage services or engage in negotiating, selling, leasing, or concluding property transactions. All project information displayed on this website, including prices, availability, layouts, images, and specifications, is provided for general informational purposes only, may be amended by the developer without notice, and is not guaranteed for accuracy or completeness. All property listings and enquiries displayed on or generated through this website are provided, authorised, and handled by Aqua Properties LLC, a RERA-registered real estate brokerage in the UAE, which independently contacts prospective buyers and facilitates transactions directly between buyers and developers under valid advertising permits. Projectory.ae is not a party to any transaction and bears no responsibility for contractual terms, payments, or outcomes.